The 1.5 GW solar project in Bandewala, Bikaner, is India’s largest ramming foundation project, executed with high precision and efficiency. Located in Rajasthan’s high-temperature desert region, this project required a durable, cost-effective, and fast-deployable foundation solution to support large-scale solar installations.
Challenges & Solutions
- Extreme Climate Conditions: The site experiences high temperatures, strong winds, and shifting sandy soil, making foundation stability a key concern.
- Solution: SunTap utilized deep rammed foundations, ensuring high structural stability against wind loads and soil shifting.
- Large-Scale Execution: Covering an extensive area, the project demanded high-speed installation without compromising accuracy.
- Solution: With advanced hydraulic ramming machinery, SunTap achieved a fast-track execution rate of 1GW+ per month, significantly reducing installation time.
- Environmental Considerations: The project aimed to minimize environmental impact by reducing concrete usage.
- Solution: SunTap’s zero-concrete foundation approach eliminated soil pollution and water consumption, making it a sustainable choice.
Key Project Highlights
✅ Capacity: 1.5 GW – India’s largest ramming foundation project
✅ Foundation Type: Rammed pile foundation for superior load-bearing capacity
✅ Soil Condition: Sandy terrain requiring deep, reinforced foundation stability
✅ Completion Year: 2022
✅ Execution Speed: Installed at 1GW+ per month, ensuring timely project delivery
✅ Eco-Friendly Approach: Eliminated concrete, reducing environmental footprint
✅ Client & Industry Recognition: Set a new industry benchmark for fast and cost-efficient solar foundation installations
Project Impact
- Boosted Renewable Energy Output – Contributing significantly to India’s solar power capacity.
- Improved Efficiency & Cost Savings – Reduced foundation costs by 30% compared to traditional methods.
- Enhanced Structural Durability – Ensured long-term reliability in extreme weather conditions.
SunTap: Setting New Standards in Solar Infrastructure
The Bandewala, Bikaner 1.5 GW project is a testament to SunTap’s expertise in delivering large-scale, high-performance solar foundation solutions. Our innovative approach in rammed foundation technology ensures that solar infrastructure remains strong, durable, and sustainable for decades to come.
📩 Need a foundation solution for your solar project? Contact SunTap today!