The 420 MW solar project in Dholera, Bikaner, is one of India’s largest and fastest executed solar foundation projects. Situated in Rajasthan’s semi-arid desert region, this project required a foundation solution that could withstand harsh weather conditions, shifting sand, and high wind loads, while ensuring cost efficiency and rapid installation.
Challenges & Solutions
- Harsh Environmental Conditions: The site faced high temperatures, loose sandy soil, and strong winds, posing challenges to foundation stability.
- Solution: SunTap implemented rammed foundations with optimized depth to ensure long-term durability and resistance to soil displacement.
- Tight Project Deadline: The project demanded fast execution to meet regulatory timelines and power purchase agreements.
- Solution: With state-of-the-art hydraulic ramming machinery, SunTap completed installation at an accelerated pace, achieving one of the fastest deployment rates in the industry.
- Sustainable Execution: The project aimed to be environmentally friendly, minimizing the use of concrete and excessive land disruption.
- Solution: SunTap’s zero-concrete approach reduced environmental impact, eliminating soil contamination and excessive water usage.
Key Project Highlights
✅ Capacity: 420 MW – One of India’s largest solar foundation projects
✅ Foundation Type: Rammed pile foundation for enhanced stability and load-bearing efficiency
✅ Soil Condition: Sandy and dry terrain requiring deep pile installation
✅ Completion Year: 2021
✅ Execution Speed: Installed at record-breaking speed, ensuring timely project completion
✅ Sustainability: Eliminated concrete use, reducing carbon footprint and preserving soil health
✅ Client Satisfaction: Delivered ahead of schedule, setting a new industry standard for fast, efficient, and eco-friendly foundation installation
Project Impact
- Accelerated Renewable Energy Production – Helping India achieve its solar energy goals faster.
- Cost-Effective & Durable Infrastructure – Reduced foundation costs by up to 30%, while ensuring long-term reliability.
- Enhanced Stability & Performance – Designed to withstand harsh desert conditions for decades.
SunTap: Delivering High-Performance Solar Foundations
The Dholera, Bikaner 420 MW project showcases SunTap’s commitment to excellence, efficiency, and sustainability. Our expertise in rammed foundation technology ensures that solar farms remain structurally strong, cost-effective, and environmentally responsible.
📩 Planning a solar project? Get in touch with SunTap for expert foundation solutions!