Power Evacuation (PE) System Planning:

         • Identification of a nearest existing power evacuation (PE) option (interconnection point) with the State Transmission Utility (STU) at the             voltage level of 33/132 kV or a higher voltage and which is not a distribution sub-station.

         • Preparation of a PE scheme: Schematic diagram along with technical specification from Solar PV Project pooling station to receiving             Grid Sub-station in consultation with and after obtaining the prior written approval of client before submission to the state department.

 

         • Making available both government /private land options availablejustification of the best suited technology.